Measures G and C Construction Updates

2024-2025 Construction Zones and Impacts

Smithwick Theatre New Roof

  • Project completed Nov. 30, 2024. Stairs from Lot 1 now open. 

Library Restrooms Closed


The two restrooms inside the Library (3500) will be converted to all gender. The library will remain in use, but students who require a distraction-free studying space will be made aware of alternate rooms (LRC/STEM Center, etc.) that they can use as well as the locations of the nearest restrooms.

8500 Restrooms Closed - Open Date TBD

The two restrooms outside the Veterinary Technology classroom (8507) will be converted to all gender.  Restrooms on the next floor (8600) will be open.

What are Measures G and C?

Measure G


On March 3, 2020, voters in the 17³Ô¹Ï-De Anza Community College District’s service area approved by a 58.8% margin an $898 million general obligation bond measure to upgrade facilities preparing students/veterans for university transfer and careers in fields such as healthcare, nursing, technology, engineering/sciences; to upgrade and repair aging classrooms as well as labs for science, technology, engineering/math-related fields of instruction; and to acquire, construct, repair facilities, equipment and sites.

Measure C

On June 6, 2006, voters in the 17³Ô¹Ï-De Anze Community College District's service area approved by a 65.69% margin a $490.8 million bond (Measure C).

These measures have and will enable the District to:

  • Upgrade electrical, heating, ventilation systems, fire/seismic safety;
  • Repair leaky roofs;
  • Improve disabled access;
  • Repair/expand classrooms;
  • Upgrade technology; and
  • Repair, construct, acquire, equip buildings, classrooms, libraries, sites, science/computer labs.

Read the.

For additional information, visit the .

Current Projects

Measure C Design Projects
  • Lot 5B Modular Removal/Additional Parking
  • B1900 MPOE
Measure C Construction Projects
  • B1100 Wheelchair Lift Replacement
  • B2500 Reroof
  • Veteran's Rotary Plaza
Measure C Construction Projects
  • District Office Building

Measure C Project Updates

Fall 2018

All major projects have been completed with the exception of the new district office building, which began construction January 2017. Estimated completion date is December 2018.

For location details, download construction map.

 

Campus Map with construction areas

 

 

 

building with flowers

Questions?
We're Here to Help!

Asha Jossis,  Supervisor, Finance and Administration 

650.949.7253


jossisasha@fhda.edu


Building 1900, Office 1909

Other Measure C 17³Ô¹Ï Contacts
  • Bret Watson, VP of Finance and Administrative Services, 650.949.7364
  •  

 

Top